DC710 Greenfield Express Site

DC710 Greenfield Express Site

Reducing costs and increasing speed to market are two of the most important issues for any operator rolling out wireless infrastructure.

The DC710 Express Site is an extremely efficient turnkey solution for constructing Greenfield or Brownfield sites with minimal lead-time and minimal time on site.

The modular design epitomises Dynamic Concepts approach to innovative design. It reflects our drive to provide world-class solutions with uncompromised flexibility, optimised efficiency, massive improvements in Health and Safety, and minimal environmental impact using less steel than its counterparts and without the need for a concrete foundation.

The standard base is designed to accommodate any Dynamic Concepts tower or monopole up to a height of 20-metres (assuming UK generic design criteria), however, in recognition that some customers may already be committed to existing contracts, other manufacturers towers can also be accommodated.

The DC710 Express Site can be installed quickly and economically. It can be used to greater depths for problem ground conditions and even drilled and anchored into rock by simply changing the drilling head. The standard frame can also be deployed on a ballast-weighted base where a temporary or non-ground penetrative solution is desired.

NOT SURE WHAT YOU'RE LOOKING FOR, ASK US

© dynamic concepts (international) limited 2004. all rights reserved